Nov 15, 2025

Sealing Machine Operation Precautions and Daily Maintenance:

Leave a message

1. This machine uses a 220V single-phase three-wire power supply. Grounding must be reliable; otherwise, personal safety will be compromised.

2. Metal parts must not be placed near the induction head.

3. Regularly check the cooling water level. For frequent use, check weekly and add cooling water as needed. It is best to use non-conductive cooling water.

4. Regularly check the pipes and joints for leaks and seepage. To prevent pipes from freezing due to low temperatures, antifreeze should be added to the water tank.

5. Maintenance and repair should follow the operating sequence.

6. Maintenance and repair should be performed by designated qualified personnel.

7. Do not open the machine casing after startup. The main power supply must be disconnected before any inspection or maintenance.

8. The machine is designed with overload and overheat protection systems. When the heat sink temperature exceeds 70 degrees Celsius, the high voltage will be cut off, and the warning light will flash. This is also protected against a momentary overload of the machine's high-voltage current (the digital display momentarily exceeds "100") caused by excessive load (i.e., the diameter of the heated bottle caps is too large, they are too tightly packed, or they are too close to the sensor head). This is normal; you can restart by pressing the "START" button.

 

Cleaning and Maintenance: Regularly clean the machine surface, base plate, lower mold slide plate, grooves, upper mold inner pressure plate, and positioning rods (Note: The power must be turned off and the machine returned to room temperature before cleaning).

Send Inquiry